The locomotive stands waiting for the crane to arrive 2304x1728 abbey_retoration_1.JPG |
The crane strips the locomotive for restoration to begin 2304x1728 abbey_retoration_2.JPG |
The crane now lifts the frames off its wheels 2304x1728 abbey_retoration_6JPG.JPG |
The vertical boiler used to provide us with boiling hot water fired by ken from the heritage group 1728x2304 abbey_retoration_8.JPG |
The boiling hot water was then put through a jet wash 1728x2304 abbey_retoration_7_JPG.JPG |
One of many Sundays spent removing oil and grease 2304x1728 abbey_retoration_3.JPG |
The old rear buffer beam readey to be removed 2304x1728 abbey_retoration_9.JPG |
After a bit more work, more completed parts ready for fitting once the wheels are ready to go back in 2304x1728 abbey_retoration_20.JPG |
More building up with weld 1728x2304 abbey_retoration_19.JPG |
A new sheet of steel to replace the badly bent and rusty buffer beam 2304x1728 abbey_retoration_11.JPG |
Once the grease and oil was removed we had to build the back of the frames up with weld 2304x1728 abbey_retoration_4_JPG.JPG |
Welding complete, and grinding back has now began 2304x1728 abbey_retoration_10JPG.JPG |
We then had the frames shot blasted and primed 2304x1728 abbey_retoration_12.JPG |
Undercoat going on 2304x1728 abbey_retoration_13JPG.JPG |
Final drilling of the new rear buffer beam before fitting 2304x1728 abbey_retoration_14.JPG |
Group members Chris and Alex checking out the new buffer beam 2304x1728 abbey_retoration_15JPG.JPG |
Now painted, they look lovely! 2304x1728 abbey_retoration_21.JPG |
New gusset plates have been made and are now being fitted by Andrew 2304x1728 abbey_retoration_16.JPG |
A view of the frames now fully gloss painted as some of the group fit the new gusset plates 2304x1728 abbey_retoration_17.JPG |
Group member Russell admires the reconditoned buffer shells after fitting 2304x1728 abbey_retoration_18.JPG |
| | | |