A view of all the runing plates cut and fitted. 2304x1728 abbey_retoration_part_2._3JPG.JPG |
A view of the new runing plates, also the overhaled buffers and draw bars are fitted. 2304x1728 abbey_retoration_part_2._1JPG.JPG |
Runing plate cut to size, drilled, and the holes cut out where the sand box and injector pipe work will go. 2304x1728 abbey_retoration_part_2.JPG |
Russell sands dowen the new running plates before priming. 2304x1728 abbey_retoration_part_2._2JPG.JPG |
The second coat of primer going on, and also the angle irons that will hold the cab and bunker are in position. 2304x1728 abbey_retoration_part_2._4JPG.JPG |
The new bunker, shes comeing on! 2304x1728 abbey_retoration_part_2._5JPG.JPG |
The mobile heritage center where all the cutting and drilling of the running pates, cab and bunker was caried out. 2304x1728 abbey_retoration_part_2._8JPG.JPG |
The only origanal part of the cab, the strengthening plate that holds the reversing leaver. 2304x1728 abbey_retoration_part_2._9JPG.JPG |
Bottom cab side. 2304x1728 abbey_retoration_part_2._6JPG.JPG |
Half cab! 2304x1728 abbey_retoration_part_2._7JPG.JPG |
The top back of the cab. 2304x1728 abbey_retoration_part_2._10JPG.JPG |
Back of cab and coal bunker complete. 2304x1728 abbey_retoration_part_2._11JPG.JPG |
Alex and Russell happey now the cab is almost complete. 2304x1728 abbey_retoration_part_2._12JPG.JPG |
The replica works plates we have had made painted and ready for fitting. 2304x1728 abbey_works_plate.JPG |
Cab runing plates and coal bunker complet, and under coated. Once we have finished seting up our container as workshop and mess room we wiil fit the new cab roof. 2304x1728 abbey_retoration_part_2._13JPG.JPG |
|